dc.contributor.authorSimanjuntak, Manlian Ronald A.
dc.contributor.authorTachlish, Anang Noer
dc.date.accessioned2020-08-13T03:27:58Z
dc.date.available2020-08-13T03:27:58Z
dc.date.issued2020
dc.identifier.citationAdhiputra, R., & Rambe, A. P. (2017). Analisis Faktor Penyebab Keterlambatan Proyek Konstruksi Jalan Tol (Studi Kasus : “Jalan Bebas Hambatan Medan-Kualanamu”). Jurnal Teknik Konstruksi USU, 4(2). Ali, A. S., & Rahmat, I. (2010). The performance measurement of construction projects managed by ISOcertified contractors in Malaysia. Journal of Retail and Leisure Property, 9(1), 25–35. De Valence, G. (2010). Innovation, Procurement and Construction Industry Development. Construction Economics and Building, 10(4), 50–59. Herman Steyn. (2012). A Framework for Managing Quality on System Development Projects. Journal of Project Management for Engineering, Business, and Technology. Igwenagu, C. (2016). Fundamentals of Research Methodology and Data Collection. Nsukka: LAP Lambert Academic Publishing. Junior, R. R., & Carvalho, M. M. de. (2013). Understanding the Impact of Project Risk Management on Project Performance: an Empirical Study. Journal of Technology Management & Innovation, 8, 14–23. https://doi.org/10.4018/978-1-4666-2800-7.ch002 Kamar, K. A. ., Alshawi, M., & Hamid, Z. (2009). Industrialised Building System: The Critical Success Factors. International Postgraduate Research Conference, 29–30. Khusainov, Z. K. (2018). Technology of Project Time Management. Journal of Revista Espacios, 39(4), 35. Kujala, J., Brady, T., & Putila, J. (2014). Challenges of Cost Management in Complex Projects. International Journal of Business and Management, 9(11), 48–58. Laporan Bulanan Proyek Tol Cibitung-Cilincing, PT. Waskita Karya (Persero) Tbk. 2018 Mohd Asmoni, M. N. A., Mohammed, A. H., Mei, J. L. Y., & Ting, L. S. (2015). Critical Success Factors of Project Quality Management System for Malaysian Construction Industry. Jurnal Teknologi, 74(2), 123– 131. https://doi.org/10.11113/jt.v74.4532 Nawi, M. N. M., Azman, M. N. A., Baluch, N., Kamar, K. A. M., & Abd Hamid, D. Z. (2015). Study On The Use of Industrialised Building System in Malaysian Private Construction Projects. ARPN Journal of Engineering and Applied Sciences, 10(17), 7368–7374. Rashidi, A., & Ibrahim, R. (2017). Industrialized Construction Chronology: The Disputes and Success Factors for a Resilient Construction Industry in Malaysia. The Open Construction and Building Technology Journal, 11(1), 286–300. Simanjuntak, M. R. A., & Agung. (2018). Analysis of Project Cost Management and The Effect On Cost Overrun In Construction Projects. International Journal of Innovative Research in Science, Engineering and Technology, 7(7), 8049–8054. Sora, N. (2015). Pengertian Populasi Dan Sampel Serta Teknik Sampling. Sugiyono. (2010). Metode Penelitian Kuantitatif Kualitatif dan R&D (2014th ed.). Bandung: Alfabeta. Taleb, H., Ismail, S., Wahab, M. H., Mardiah, W. N., Rani, W. M., & Amat, R. C. (2017). An Overview of Project Communication Management in Construction Industry Projects. Journal of Management, Economics and Industrial Organization, 1–9.id_ID
dc.identifier.issn2580-8834
dc.identifier.urihttp://hdl.handle.net/11617/12161
dc.description.abstractPembangunan ruas jalan tol tersebut di atas ditujukan pula untuk mengoptimalkan penggunaan jalan tol yang telah ada, serta mengurangi beban lalu lintas di jalan-jalan arteri, sehingga kelancaran arus lalu lintas di jalan arteri dalam kota bisa tercapai sesuai dengan yang tertera dalam Surat keputusan Menteri Pekerjaan Umum No.369/KPTS/M/2005 tentang Rencana Umum Jaringan Jalan Nasional. Permasalahan dalam penelitian ini akan menyelesaikan beberapa hal, antara lain yaitu: Apa saja tahapan proses pelaksanaan kontruksi jalan tol cibitung cilincing? Bagaimana metode konstruksi yang dilaksanakan di konstruksi jalan tol cibitung cilincing? Apa saja risiko yang mengakibatkan keterlambatan proses konstruksi? Bagaimana hasil analisis risiko keterlambatan proses konstruksi jalan tol cibitung cilincing? Hasil analisis dengan metode survey lapangan, juga mengacu ke beberapa data sekunder yang relevan serta dengan analisis statistic melalui program SPSS ini berhasil dan dapat memberikan masukan bagi pelaksanaan proyek yang dimulai dari proses desain, procurement, pelelangan konstruksi, hingga pada pelaksanaan yang mengutamakan kualitas konstruksi, ketepatan waktu kerja serta perihal kesehatan dan keselamatan pada lingkungan kerja (K3). Selain itu, hasil dari analisis ini diharapkan dapat berdampak kepada masyarakat umum.id_ID
dc.language.isootherid_ID
dc.publisherSeminar Nasional Teknik Sipil X 2020id_ID
dc.titleAnalisis Risiko Keterlambatan Proses Konstruksi Jalan Tol di Jawa (Studi Kasus: Jalan Tol Cibitung Cilincing)id_ID
dc.typeArticleid_ID