dc.identifier.citation | Adhiputra, R., & Rambe, A. P. (2017). Analisis Faktor Penyebab Keterlambatan Proyek Konstruksi Jalan Tol (Studi Kasus : “Jalan Bebas Hambatan Medan-Kualanamu”). Jurnal Teknik Konstruksi USU, 4(2). Ali, A. S., & Rahmat, I. (2010). The performance measurement of construction projects managed by ISOcertified contractors in Malaysia. Journal of Retail and Leisure Property, 9(1), 25–35. De Valence, G. (2010). Innovation, Procurement and Construction Industry Development. Construction Economics and Building, 10(4), 50–59. Herman Steyn. (2012). A Framework for Managing Quality on System Development Projects. Journal of Project Management for Engineering, Business, and Technology. Igwenagu, C. (2016). Fundamentals of Research Methodology and Data Collection. Nsukka: LAP Lambert Academic Publishing. Junior, R. R., & Carvalho, M. M. de. (2013). Understanding the Impact of Project Risk Management on Project Performance: an Empirical Study. Journal of Technology Management & Innovation, 8, 14–23. https://doi.org/10.4018/978-1-4666-2800-7.ch002 Kamar, K. A. ., Alshawi, M., & Hamid, Z. (2009). Industrialised Building System: The Critical Success Factors. International Postgraduate Research Conference, 29–30. Khusainov, Z. K. (2018). Technology of Project Time Management. Journal of Revista Espacios, 39(4), 35. Kujala, J., Brady, T., & Putila, J. (2014). Challenges of Cost Management in Complex Projects. International Journal of Business and Management, 9(11), 48–58. Laporan Bulanan Proyek Tol Cibitung-Cilincing, PT. Waskita Karya (Persero) Tbk. 2018 Mohd Asmoni, M. N. A., Mohammed, A. H., Mei, J. L. Y., & Ting, L. S. (2015). Critical Success Factors of Project Quality Management System for Malaysian Construction Industry. Jurnal Teknologi, 74(2), 123– 131. https://doi.org/10.11113/jt.v74.4532 Nawi, M. N. M., Azman, M. N. A., Baluch, N., Kamar, K. A. M., & Abd Hamid, D. Z. (2015). Study On The Use of Industrialised Building System in Malaysian Private Construction Projects. ARPN Journal of Engineering and Applied Sciences, 10(17), 7368–7374. Rashidi, A., & Ibrahim, R. (2017). Industrialized Construction Chronology: The Disputes and Success Factors for a Resilient Construction Industry in Malaysia. The Open Construction and Building Technology Journal, 11(1), 286–300. Simanjuntak, M. R. A., & Agung. (2018). Analysis of Project Cost Management and The Effect On Cost Overrun In Construction Projects. International Journal of Innovative Research in Science, Engineering and Technology, 7(7), 8049–8054. Sora, N. (2015). Pengertian Populasi Dan Sampel Serta Teknik Sampling. Sugiyono. (2010). Metode Penelitian Kuantitatif Kualitatif dan R&D (2014th ed.). Bandung: Alfabeta. Taleb, H., Ismail, S., Wahab, M. H., Mardiah, W. N., Rani, W. M., & Amat, R. C. (2017). An Overview of Project Communication Management in Construction Industry Projects. Journal of Management, Economics and Industrial Organization, 1–9. | id_ID |