dc.identifier.citationAdhiputra, R., & Rambe, A. P. (2017). Analisis Faktor Penyebab Keterlambatan Proyek Konstruksi Jalan Tol (Studi Kasus : “Jalan Bebas Hambatan Medan-Kualanamu”). Jurnal Teknik Konstruksi USU, 4(2). Ali, A. S., & Rahmat, I. (2010). The performance measurement of construction projects managed by ISOcertified contractors in Malaysia. Journal of Retail and Leisure Property, 9(1), 25–35. De Valence, G. (2010). Innovation, Procurement and Construction Industry Development. Construction Economics and Building, 10(4), 50–59. Herman Steyn. (2012). A Framework for Managing Quality on System Development Projects. Journal of Project Management for Engineering, Business, and Technology. Igwenagu, C. (2016). Fundamentals of Research Methodology and Data Collection. Nsukka: LAP Lambert Academic Publishing. Junior, R. R., & Carvalho, M. M. de. (2013). Understanding the Impact of Project Risk Management on Project Performance: an Empirical Study. Journal of Technology Management & Innovation, 8, 14–23. https://doi.org/10.4018/978-1-4666-2800-7.ch002 Kamar, K. A. ., Alshawi, M., & Hamid, Z. (2009). Industrialised Building System: The Critical Success Factors. International Postgraduate Research Conference, 29–30. Khusainov, Z. K. (2018). Technology of Project Time Management. Journal of Revista Espacios, 39(4), 35. Kujala, J., Brady, T., & Putila, J. (2014). Challenges of Cost Management in Complex Projects. International Journal of Business and Management, 9(11), 48–58. Mohd Asmoni, M. N. A., Mohammed, A. H., Mei, J. L. Y., & Ting, L. S. (2015). Critical Success Factors of Project Quality Management System for Malaysian Construction Industry. Jurnal Teknologi, 74(2), 123–131. https://doi.org/10.11113/jt.v74.4532 Nawi, M. N. M., Azman, M. N. A., Baluch, N., Kamar, K. A. M., & Abd Hamid, D. Z. (2015). Study On The Use of Industrialised Building System in Malaysian Private Construction Projects. ARPN Journal of Engineering and Applied Sciences, 10(17), 7368–7374. Rashidi, A., & Ibrahim, R. (2017). Industrialized Construction Chronology: The Disputes and Success Factors for a Resilient Construction Industry in Malaysia. The Open Construction and Building Technology Journal, 11(1), 286–300. Simanjuntak, M. R. A., & Agung. (2018). Analysis of Project Cost Management and The Effect On Cost Overrun In Construction Projects. International Journal of Innovative Research in Science, Engineering and Technology, 7(7), 8049–8054. Sora, N. (2015). Pengertian Populasi Dan Sampel Serta Teknik Sampling. Sugiyono. (2010). Metode Penelitian Kuantitatif Kualitatif dan R&D (2014th ed.). Bandung: Alfabeta. Taleb, H., Ismail, S., Wahab, M. H., Mardiah, W. N., Rani, W. M., & Amat, R. C. (2017). An Overview of Project Communication Management in Construction Industry Projects. Journal of Management, Economics and Industrial Organization, 1–9. Tim proyek Tol Cibitung Cilincing, PT. Waskita Karya (Persero) Tbk. 2018, Desain Lama, Reviw Desain, Laporan Bulanan Proyek Tol Cibitung-Cilincing.id_ID
dc.identifier.issn2580-8834
dc.identifier.urihttp://hdl.handle.net/11617/12174
dc.description.abstractRencana pembangunan ruas Jalan Tol Cibitung Cilincing dimaksudkan untuk membantu mengatasi permasalahan lalu lintas di Kota Jakarta dan wilayah-wilayah di sekitarnya dan mengurangi beban lalu lintas di jalan-jalan arteri, sehingga kelancaran arus lalu lintas di jalan arteri dalam kota bisa tercapai sesuai dengan yang tertera dalam Surat keputusan Menteri Pekerjaan Umum No.369/KPTS/M/2005 tentang Rencana Umum Jaringan Jalan Nasional. Permasalahan dalam penelitian ini akan menyelesaikan beberapa hal, antara lain yaitu: Faktorfaktor apa yang perlu diperhatikan dalam risiko keterlambatan proses pelaksanaan proyek Konstruksi Jalan Tol? Variabel-variabel apa yang perlu diperhatikan dalam risiko keterlambatan proses pelaksanaan proyek Konstruksi Jalan Tol? Bagaimana hasil analisis korelasi dan interkorelasi risiko keterlambatan proses Pelaksanaan Konstruksi Jalan Tol? Hasil analisis dengan metode survey lapangan, juga mengacu ke beberapa data sekunder yang relevan dengan analisa korelasi dan interkorelasi. Hasil penelitian ini memberikan masukan bagi pelaksanaan proyek tentang faktor dan variabel risiko pada proyek yang mengutamakan kualitas konstruksi, ketepatan waktu kerja serta cost-effectiveness, maupun perihal kesehatan dan keselamatan pada lingkungan kerja (K3). Selain itu, hasil dari analisis ini dapat juga berdampak kepada masyarakat umum.id_ID
dc.language.isootherid_ID
dc.publisherSeminar Nasional Teknik Sipil X 2020id_ID
dc.titleHasil Analisis Korelasi dan Interkorelasi Risiko Keterlambatan Proses Pelaksanaan Konstruksi Jalan Tolid_ID
dc.typeArticleid_ID