    ANALISIS PENGEMBANGAN UP-DOWN MENJADI SEMI UP-DOWN CONSTRUCTION METHOD PADA PROYEK KONSTRUKSI GEDUNG PUSAT RUMAH SAKIT SANTO BORROMEUS BANDUNG

    Thumbnail
    View/Open
    _11_ SUMARGO.pdf (6.640Mb)
    Date
    2008-07
    Author
    Sumargo
    Sofyan, Ahmad
    Budiana, Asep
    Agus Utomo, Dwijo
    Metadata
    Show full item record
    Abstract
    Construction method sometimes is neglected resource in a project of construction. In general the contractor conduct the thrift at the transportation cost added by materials wich tend to decrease the quality, in fact it could be avoided if there is an innovation in construction method. This matter requires the existence of a modification from an execution method by reviewing the design in order to maximize the performace of construction. So that development of a project construction can be executed effectively and efficiently. One of the innovation is Semi Up-down construction method, that is innovated by PT. PP (Persero) Branch IV West Java. Wich is the development of the Up-down method. Int this method, the sub structure and upper structure were constructed simultaneously with some modifications for several work, such as soil cutting, retaining wall and some other conditional work that could be modified for effective and efficiently. This method has been applied at the development of Building Center of Santo Borromeus Hospital Bandung, and resulted in cost effectiveness about 7 % for structural construction with 50 % time construction faster than conventional method. Structural construction cost was Rp. 12.043.356.867,00 and Rp. 11.171.640.502,00 for conventional and semi up-down method, respectively. Construction time with semi up-down method was about 1 year and could double with conventional method.
    URI
    http://hdl.handle.net/11617/148
    Collections
    • Volume 08 No. 2, Juli 2008

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    Publikasi IlmiahCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV