RISK MANAGEMENT OPERATIONAL IN READYMIX CONCRETE INDUSTRY
dc.contributor.author | Limanto, Sentosa | |
dc.contributor.author | Chandra, Herry P. | |
dc.date.accessioned | 2012-06-21T05:21:53Z | |
dc.date.available | 2012-06-21T05:21:53Z | |
dc.date.issued | 2010-01 | |
dc.identifier.citation | Dorfman, Mark S., 2000, Inroduction to Risk Management and Insuran-ce, Prentice Hall International, London. Kezsbom, D.S., Edward, K., 2001, The New Dinamic Project Mana-gement: Winning through the Competitive, Advantage Wiley, Eng-land. Siagian, Faira,. Sekarsari, Jane, 2001, Penerapan Model Manajemen Ri-siko pada Proyek Konstruksi Joint Venture di Indonesia Suatu Studi Kasus. Universitas Trisakti, Jakarta. Limanto, S., Arief, T.A., Josep, B., Sanjaya, A., 2002, Studi Awal Kebijaksanaan Perusahaan Concrete Readymix dengan Menggunakan Metode Fuzzy Dalam Memilih Penyuplaian Material Beton, Surabaya, Indonesia: Dimensi Teknik Sipil, Vol.7, No.1 Maret 2005, pp, 45-46. Lasakar, Frengky, 2002, Model Simulasi UM-Cyclone pada operasional Perusahaan Beton Siap Pakai, Surabaya, Indone-sia, Tesis Megister Teknik, Universitas Kristen Petra, Sura-baya. Kerzner, Harold, 2004, Project Management, Baldwin-Wallace College Barea, Ohio Niehaus, Harrington, 2005, Risk Management and Insuranc,e second edition. Jhon Wiley, New York. Limanto, S., Chandra, H.P., Sutanto, A., Gunawan, T., 2006, Manajemen Resiko Bidang Operasional Pada Readymix Con-crete, Surabaya, Indonesia, Tugas Akhir Teknik Sipil, Universitas Kristen Petra, Surabaya. | en_US |
dc.identifier.issn | 1411-8904 | |
dc.identifier.uri | http://hdl.handle.net/11617/1662 | |
dc.description.abstract | Construction project recently is become more complex that cause a sufficient strategy, which is named risk management. Risk management is an application of general management which related by some activities that can cause a risk. Risk management itself always relevant with the method that is used by a company for prevention or overcome risks. Readymix concrete is an instant concrete which automatically mix on batching plant then are sent to consumen. This observation studying how to manage risk management on readymix concrete company, which consist of three steps, which are: identify and evaluate (measure frequency and severity) of risks, choose method and implement them, and control the suitability of chosen risk management method. Company that researched is PT. Anugerah Beton Indonesia.Observation analysis result show that contract sector have a biggest risk (frequency = 2.00 and severity = 3.00). | en_US |
dc.publisher | lppmums | en_US |
dc.subject | risk management | en_US |
dc.subject | readymix concrete | en_US |
dc.subject | frequency | en_US |
dc.subject | severity | en_US |
dc.title | RISK MANAGEMENT OPERATIONAL IN READYMIX CONCRETE INDUSTRY | en_US |
dc.title.alternative | MANAJEMEN RISIKO PADA OPERASIONAL PERUSAHAAN BETON SIAP PAKAI | en_US |
dc.type | Article | en_US |