dc.identifier.citationAiling, C. 2009. Facility Layout Improvement Using Systematic Layout Planning (SLP) and ARENA. Universiti Teknologi Malaysia. Banks, C., and N. Nelson. 2010. Discrete-Event System Simulation 5th Edition. New Jersey : Pearson Education, Inc. Baskoro, Y.A. 2010. Plant Relocation of PT. Sanken Argawidjaja by Using Systematic Layout Planning (SLP) Combine with Flow Analysis and Assembly Process Design. Department of Industrial Engineering, Swiss German University, Bumi Serpong Damai. Hopp, W.J. and M.L. Spearman. 2008. Factory Physics 3rd Edition. Singapore : McGraw – Hill Companies, Inc. Kitriastika, V. 2012. A Redesign Layout to Increase Productivity (Case Study : PT. Inkoasku). Department of Industrial Engineering, Swiss German University, Bumi Serpong Damai. Meyers, F.E., and M.P. Stephens. 2005. Manufacturing Facilities Design and Material Handling. New Jersey : Pearson Prentice Hall. Prawira, A.R. 2011. Analysis of Soekarno Hatta Airport Runway Capacity by Using Discrete Event Simulation Method. Swiss German University. Bumi Serpong Damai. Saerang, E.V. 2011. Analysis, Synproject and Discrete Event Simulation to Increase Productivity of Pump Packaging System. Department of Industrial Engineering, Swiss German University, Bumi Serpong Damai, 2011. Salsabil, M.R. 2010. Designing a Self Service Kiosk System to Reduce the Queuing Time of Cinema’s Customers. Department of Industrial Engineering, Swiss German University, Bumi Serpong Damai.en_US
dc.identifier.issn1412-6869
dc.identifier.urihttp://hdl.handle.net/11617/3304
dc.description.abstractThis project is conducted in Company X, a passenger cars wheel producing company located in Sunter, North Jakarta. With a view of increasing the productivity of the company, the focus of this project will be redesigned the layout of the factory. The main problem encountered is that the goods are not produced in single location, causing a considerable hindrance in terms of time and distance, and hence efficiency. The redesigning layout process will use SLP method and flow analysis while supported by analysis of assembly line balancing to optimize the layout. Regarding the evaluation process, ARENA software will be used to simulate and identify the bottleneck in the production process, and comparing the layout alternatives to decide the best layout. The best chosen layout according to the simulation and SLP method that supported with flow analysis and assembly line balancing will be used as the master draft layout that will be proposed to Company X.en_US
dc.publisherlppmumsen_US
dc.subjectSystematic Layout Planning (SLP)en_US
dc.subjectFlow Analysisen_US
dc.subjectAssembly Line Balancingen_US
dc.subjectProductivityen_US
dc.subjectSimulationen_US
dc.titleA REDESIGN LAYOUT TO INCREASE PRODUCTIVITY OF A COMPANYen_US