dc.identifier.citation | Daihani, U.D. 2001. Komputerisasi Pengambilan Keputusan. PT. Elex Media Komputindo, Jakarta. Gaspersz. V. 1998. Production Planning And Inventory Control Berdasarkan Pendekatan System Berintegrasi MRP II & JIT menuju Manufakturing. Gramedia Pustaka Utama, Jakarta Hans-Peter Wiendahl. 2001. Load-oriented manufacturing control. Institut for Fabrikanlagen, University Hannover. Henrich P., M. Land, G. Gaalman. 2003. Introducing the workload control concept into MTO companies: Determining Applicability, Determining Applicability. Martiani, T. 2007. Sistem Pendukung Keputusan Penerimaan Pesanan dan Pengendalian Produksi. Skripsi S-1. Universitas Ahmad Dahlan, Yogyakarta Rodhiyah, S. 2006. Sistem Pendukung Keputusan Untuk Pengendalian Produksi dengan Menggunakan Load Oriented Manufacturing Control (LOMC), Skripsi S-1, Universitas Ahmad Dahlan, Yogyakarta. Stevenson, M. and L. Hendry. 2004. Aggregate Load Oriented Workload Control. Lancaster University Management School, Working Paper, 2004/023. Suryadi, K. dan A. Ramdani. 2002. Sistem Pendukung Keputusan, PT. Remaja Rosdakarya, Bandung. Tjiptono, F. 1997. Strategi Pemasaran edisi 2. Andi Offset, Yogyakarata Wiendahl, H.P. 1995. Load-Oriented Manufakturing Control, Springer verlag, Berlin. | en_US |
dc.description.abstract | CV. Grafika Inndah is a printing company, majoring in job orderproduction system. While so far, the company has problems on the decisionmaking due to lead time for booking orders that the company can acceptcustomer orders according to quantity and due date. The production process ofthe design, print finishing and that includes the print engine 52 and engine Sakuraprint shop. The station receives a print job that exceeds the load capacity. Thusthis research aims to determine the lead time, the average output and averageutility. Data processing in this study using the method of manufacturing systemsbased load control (load oriented manufacturing control), and to assist indecision-making applications built using Delphi. Programming of the analysis ofthe data processing method known LOMC can the average lead time work station2.88 hours and an average of 99.7% utilities, and Print Shop Lead time averageof 1.82 hours and an average of 99.85% utilities. Decision support system appliedin this study deserves to be implemented. It can be seen from the test programusing the Black Box Test and Alpha Test is evidenced in respondents answeredSS (strongly agree) as much as 48% and S (agree) as much as 46% . | en_US |