Penentuan Jadwal Perawatan Komponen Kritis Melalui Analisis Kerusakan Mesin dengan Pendekatan Mean Time To Failure
Abstract
One of the factors that support the smooth operation of a company is the readiness of the
production machines in performing their duties. Therefore we need a good maintenance system.
The problem faced by the company is not a critical component maintenance scheduling, so that the
production process is hampered and maintenance costs are high because of the length of the
machine is improved. Attempts to overcome these problems can be done through maintenance
scheduling. Scheduling a critical component of treatment made by considering the nature of
repairable components and non-repairable. Determination of the critical components of the
maintenance schedule of the calculation based Mean Time To Failure of each component reliability
approach. The results obtained in the form of scheduling maintenance of critical components. Care
repairable components made within the period of 52.538 days for the engine generator sortase to
151.01 days for s.part panel box on the machine sortase. While the treatment of non-repairable
components made within the period of 39.335 days for a magnetic conveyor roll up to 314.481 days
to gear the engine ECP dyer.