Show simple item record

dc.contributor.authorWigati, Slamet Setio
dc.contributor.authorBintoro, Agustinus Gatot
dc.date.accessioned2013-12-20T09:12:50Z
dc.date.available2013-12-20T09:12:50Z
dc.date.issued2013-12
dc.identifier.citationAffisco, J., F., Paknejad, M., J., dan Nasri, F., 2002, Quality improvement and setup reduction in the joint economic lot size model, European Journal of Operational Research, Vol. 142, Hal. 497-508. Barlow, R. E. dan Proschan, F., 1965, Mathematical theory of reliability, John Wiley, New York. Blischke, W.R. dan Murthy, D.N.P., 1994, Warranty Cost Analysis, Marcel Dekker, New York. Golhar, D.Y. dan Sarker, B.R., 1992, Economic Manufacturing Quantity in Just-in Time Delivery System, Int.J.Prod.Res., 30(5), 961-972. Hax, A.C. dan Candea, D., 1984, Production and Inventory Management, Prentice-Hall, Englewood Cliffs, New Jersey. Jamal, A.M.M dan Sarker, B.R., 1993, An Optimal Batch Sice for a Production System Operating Under a Just-in Time Delivery System, International Journal of Production Economics, Vol.32, Hal. 255-260. Kim, H.C. dan Hong, Y., 1997, An Extended EMQ Model for Failure Prone Machine with general Lifetime Distribution, International Journal Production Economics, Vol.49, Hal. 215-223. Kim, S.L. dan Ha, D., 2003, “A JIT Lot-Splitting Model for Supply Chain Management: Enhancing Buyer-Supplier Linkage”, International Journal of Production Economics, Vol. 86, Hal. 1-10. Lee, H.L., 1992, Lot Sizing to Reduce Capacity Utilization in A production Process with Defective Items, Process Correction, and Rework. Management Science, Vol.38, Hal.1314-1328. Nieuwenhuyse, I.V., dan Vandaele, N., 2006, The Impact of delivery lot splitting on delivery reliability in a twostage supply chain, International Journal of Production Economics, Vol. 104, Hal. 694-708. Pearson, J., dan Wilson, J., 1990, The Composition and Scope of JIT, Operation Management Riview, 7 (3&4), 918. Porteus, E.L., 1986, Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction, Operations Research , Vol. 34, Hal. 137-144. Ross, S.M., 1983, Stochastics Processes, Willey, New York. Rosenblatt, M.J. dan Lee, H.L., 1986, “Economic production cycles with imperfect production processes”, IIE Transaction, Vol. 18, Hal. 48-55 Silver, E.A., dan Peterson, R., 1985, Decision System for Inventory Management and Production Planning, Willey, New York. Silver, E.A., Pyke, D.F dan Peterson, R., 1998, Inventory Management and Production Scheduling, John Wiley and Sons, New York. TC Simposium Nasional RAPI XII - 2013 FT UMS ISSN 1412-9612 Sung, C.S., and Ock, Y.S., 1992, Optimal Production Policy for a Single-Product Single-Machine Problem With Intermediate Machine Inspection Allowed, International Journal of Production Economics, Vol. 28, Hal. 8594. Tseng, S., T., Yeh, R., H., Ho, W., T., 1998, Imperfect maintenance policies for deteriorating production systems, International Journal of Production Economics, Vol. 55, Hal. 191-201. Wang, C., H., and Sheu, S., H., 2001a, The effect of the warranty cost on the imperfect EMQ model with general discrete shift distribution, Production Planning and Control, Vol. 12, No. 6, Hal. 621-628. Wang, C., H., and Sheu, S., H., 2001b, Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorating production system, Computer and Operation Research, Vol. 28, Hal. 1093-1110. Yeh, R. H., Ho, W. S. dan Tseng, S. T., 2000, “Optimal production run length for products sold with warranty”, European Journal of Operational Research, Vol. 120, Hal. 575-582.en_US
dc.identifier.issn1412-9612
dc.identifier.urihttp://hdl.handle.net/11617/4042
dc.description.abstractPenelitian ini mengembangkan model sistem produksi terintegrasi antara pemasok-produsen/buyer dalam lingkungan JIT. Model yang dikembangkan adalah model dengan satu pemasok dan satu produsen/buyer, dengan mempertimbangkan rancangan (non-conforming) dan 2 1 adanya produk yang tidak memenuhi spesifikasi garansi produk yang diberikan pemasok kepada produsen/buyer dan garansi produk yang diberikan produsen ke konsumen. Buyer merupakan perusahaan yang menerapkan sistem JIT sehingga permintaan ke buyer jumlahnya tidak banyak. Pada penelitian ini, karena pemasok adalah IKM atau industry rumahan, maka pemasok memproduksi sesuai dengan ukuran lot buyer. Periode garansi yang diberikan pemasok kepada buyer dan periode garansi yang diberikan buyer kepada konsumen sudah ditentukan lebih dahulu sehingga variabel keputusan dalam penelitian ini adalah ukuran lot produksi (Q) yang optimal. Model matematik yang dikembangkan adalah model total ongkos gabungan yang terdiri dari total ongkos pemasok dan total ongkos buyer. Solusi yang optimal, yaitu ukuran lot produksi yang optimal (Q * ) yang meminimumkan ongkos gabungan akan ditentukan secara analitik. Contoh numerik akan diberikan untuk memberikan ilustrasi penyelesaian masalah.en_US
dc.publisherlppmumsen_US
dc.subjectModel sistem produksien_US
dc.subjectproduk non-conformingen_US
dc.subjectgaransien_US
dc.subjecttotal cost gabunganen_US
dc.titleModel Sistem Produksi Pemasok – Produsen dalam Lingkungan Jit dengan Mempertimbangkan Produk Non-Conforming dan Garansi Produken_US
dc.typeArticleen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

  • Simposium Nasional Ke-12 RAPI 2013
    Pengembangan Teknologi Berbasis Pendekatan Kluster & Konsorsium Riset Menuju Masterplan Pengembangan Percepatan Pembangunan Ekonomi Indonesia (MP3EI)

Show simple item record