dc.identifier.citation | Affisco, J., F., Paknejad, M., J., dan Nasri, F., 2002, Quality improvement and setup reduction in the joint economic lot size model, European Journal of Operational Research, Vol. 142, Hal. 497-508. Barlow, R. E. dan Proschan, F., 1965, Mathematical theory of reliability, John Wiley, New York. Blischke, W.R. dan Murthy, D.N.P., 1994, Warranty Cost Analysis, Marcel Dekker, New York. Golhar, D.Y. dan Sarker, B.R., 1992, Economic Manufacturing Quantity in Just-in Time Delivery System, Int.J.Prod.Res., 30(5), 961-972. Hax, A.C. dan Candea, D., 1984, Production and Inventory Management, Prentice-Hall, Englewood Cliffs, New Jersey. Jamal, A.M.M dan Sarker, B.R., 1993, An Optimal Batch Sice for a Production System Operating Under a Just-in Time Delivery System, International Journal of Production Economics, Vol.32, Hal. 255-260. Kim, H.C. dan Hong, Y., 1997, An Extended EMQ Model for Failure Prone Machine with general Lifetime Distribution, International Journal Production Economics, Vol.49, Hal. 215-223. Kim, S.L. dan Ha, D., 2003, “A JIT Lot-Splitting Model for Supply Chain Management: Enhancing Buyer-Supplier Linkage”, International Journal of Production Economics, Vol. 86, Hal. 1-10. Lee, H.L., 1992, Lot Sizing to Reduce Capacity Utilization in A production Process with Defective Items, Process Correction, and Rework. Management Science, Vol.38, Hal.1314-1328. Nieuwenhuyse, I.V., dan Vandaele, N., 2006, The Impact of delivery lot splitting on delivery reliability in a twostage supply chain, International Journal of Production Economics, Vol. 104, Hal. 694-708. Pearson, J., dan Wilson, J., 1990, The Composition and Scope of JIT, Operation Management Riview, 7 (3&4), 918. Porteus, E.L., 1986, Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction, Operations Research , Vol. 34, Hal. 137-144. Ross, S.M., 1983, Stochastics Processes, Willey, New York. Rosenblatt, M.J. dan Lee, H.L., 1986, “Economic production cycles with imperfect production processes”, IIE Transaction, Vol. 18, Hal. 48-55 Silver, E.A., dan Peterson, R., 1985, Decision System for Inventory Management and Production Planning, Willey, New York. Silver, E.A., Pyke, D.F dan Peterson, R., 1998, Inventory Management and Production Scheduling, John Wiley and Sons, New York. TC Simposium Nasional RAPI XII - 2013 FT UMS ISSN 1412-9612 Sung, C.S., and Ock, Y.S., 1992, Optimal Production Policy for a Single-Product Single-Machine Problem With Intermediate Machine Inspection Allowed, International Journal of Production Economics, Vol. 28, Hal. 8594. Tseng, S., T., Yeh, R., H., Ho, W., T., 1998, Imperfect maintenance policies for deteriorating production systems, International Journal of Production Economics, Vol. 55, Hal. 191-201. Wang, C., H., and Sheu, S., H., 2001a, The effect of the warranty cost on the imperfect EMQ model with general discrete shift distribution, Production Planning and Control, Vol. 12, No. 6, Hal. 621-628. Wang, C., H., and Sheu, S., H., 2001b, Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorating production system, Computer and Operation Research, Vol. 28, Hal. 1093-1110. Yeh, R. H., Ho, W. S. dan Tseng, S. T., 2000, “Optimal production run length for products sold with warranty”, European Journal of Operational Research, Vol. 120, Hal. 575-582. | en_US |