Pengurangan Waste Menggunakan Pendekatan Lean Manufacturing
dc.contributor.author | Jakfar, Akhmad | |
dc.contributor.author | Setiawan, Wahyu Eko | |
dc.contributor.author | Masudin, Ilyas | |
dc.date.accessioned | 2014-09-15T03:46:20Z | |
dc.date.available | 2014-09-15T03:46:20Z | |
dc.date.issued | 2014-06 | |
dc.identifier.citation | Gaspersz, V.; dan Fontana, A. 2011. Lean Six Sigma for Manufacturing and Engineering. Proceedings of International Conference on Industrial Engineering and Operations Management 2011. Kuala Lumpur. Kusuma, Sabta Adi. 2010. Penerapan Lean Manufacturing Dalam Mengidentifikasi Dan Meminimasi Waste Di PT. Hilton Surabaya. Undergraduate Thesis. Surabaya: UPN Jatim. Singgih, M. L.; & Tjiong, W. 2011. “Perbaikan Sistem Produksi Divisi Injection dan Blow Plastik”. Prosiding Seminar Nasional Manajemen Teknologi XIII, 8. DOI: 978-602-97491-2-0. Melton, T. 2005. “The Benefits Of Lean Manufacturing”. Chemical Engineering Research and Design, Vol. 83, No. 6, pp. 662-673. DOI: 10.1205/Cherd.04351. Anvari A, I. Y., Hojjati S M H 2011. A Study On Total Quality Management And Lean Manufacturing: Through Lean Thinking Approach. World Applied Sciences Journal, Vol. 12, No. 9, pp. 11-19. Hines, P.; & Taylor, D. 2000. Going Lean. Cardiff, UK: Lean Entreprise Research Centre, Cardiff Business School. Anityasari, M.; & Wessiani, NA. 2011. Analisa Kelayakan Usaha Dilengkapi dengan Kajian Manajemen Resiko. Surabaya: Guna Widya. | en_US |
dc.identifier.issn | 1412-6869 | |
dc.identifier.uri | http://hdl.handle.net/11617/4848 | |
dc.description.abstract | PT. XYZ is one of some cigarette companies in Indonesia. In producing cigarette, the firm requires a material named “etiket” which is produced by printing division for internal consumers of PT. XYZ. In order to produce “etiket”, there are some wastes occurred. One of wastes occurred in printing division is product defects. This paper attempts to identify wastes in the division of printing using Lean Manufacturing approach by applying Value Stream Mapping (VSM) method. The results from cause root analysis found that the problems caused the defects in production process. It shows that the most wastes occurs in the printing division are product defect and waiting time. The product defects are caused because there is no standard applied in processing the product and poor inspections by management, while the causes of waiting time wastes is because of lack of carrier and no standard in each process. The recommendation can be suggested to the company are adding some carrier (product’s transporter), creating process standard in each process. | en_US |
dc.publisher | Universitas Muhammadiyah Surakarta | en_US |
dc.subject | lean manufacturing | en_US |
dc.subject | Value Stream Mapping | en_US |
dc.subject | Value Stream Analysis | en_US |
dc.title | Pengurangan Waste Menggunakan Pendekatan Lean Manufacturing | en_US |
dc.type | Article | en_US |