The Momentum Rate of Change in Control Volume Silo Bunker to Coal Feeder on Power Plant Operational for Performance Analysis of Coal Distribution Prosess
dc.contributor.author | Surindra, M Denny | |
dc.date.accessioned | 2014-12-02T06:32:08Z | |
dc.date.available | 2014-12-02T06:32:08Z | |
dc.date.issued | 2014-12-04 | |
dc.identifier.citation | [1] Kuttalakkani.M, Natarajan.R, Amith Kumar Singh, Vijayakumar.J, Arunan.S, Sarojini.L., “Sensor Based Effective Monitoring of Coal Handling System (CHS)”, International Journal of Engineering and Technology (IJET), vol. 5 No. 3, pp. 2432-2435, Jun-Jul 2013. [2] Peter, B., “The Extended Discrete Element Method (XDEM) for Multiphysics Applications”, Scholarly Journal of Engineering Research, Vol. 2(1), pp. 1-20, May 2013. [3] Japan Coal Energy Center (JCOAL), “Clean Coal Technologies in Japan”, Technology Innovation in the Coal Industry, January 2007. [4] Ravenet, J., “Silo Problems, Bulk Solids Handling”, Trans Tech Publication, Vol. 1 No. 4, pp. 667-680, December 1981. [5] Siemens, “Measuring Pulverized Coal in Bunker”, Case study 2007. [6] PT. Makmur Sejahtera Wisesa, Environmental Management and Monitoring Study in 2 x 30 MW Coal Fired Steam Power Generator (PLTU) Tanjung-Tabalong”, March 2007. [7] Wlstenholme, E.F., “Designing and Assessing The Benefits of Control Policies for Conveyor Belt Systems In Underground Coal Mines”, Dynamica, Vol. 6, Part 2, pp. 25-35, Winter 1980. | en_US |
dc.identifier.issn | 2407-4330 | |
dc.identifier.uri | http://hdl.handle.net/11617/4951 | |
dc.description.abstract | A comprehensive flow-ability study from coal silo bunker, chain grade transfer and until crushed coal is needed. For the coal silo bunker to ensure smooth flow of coal in all seasons with different moisture contentsand different percentage of fines. Maintaining a constant supply of coal in the silo bunkers to coal feeder has proven to be a challenge. Tanjung Jati B power plant has units 1 and 2, each unit has 6 coal silo bunker with a capacity of 500 tons, so a total of 12 coal silo bunker. In conclusion silo bunker and coal feeder operation is not based on a precise calculation but based on secure estimates fuel supply to operate the boiler only. | en_US |
dc.publisher | Universitas Muhammadiyah Surakarta | en_US |
dc.subject | Control volume | en_US |
dc.subject | silo bunker | en_US |
dc.subject | coal feeder | en_US |
dc.title | The Momentum Rate of Change in Control Volume Silo Bunker to Coal Feeder on Power Plant Operational for Performance Analysis of Coal Distribution Prosess | en_US |
dc.type | Article | en_US |