dc.identifier.citation | Amir M. Hormozi, dkk., 2002, Business plans for new or small businesses: paving the path to success, Management Decision, Vol. 40 Iss 8 pp. 755 – 763. Amiaty, R. T., 2009, Kajian Mengenai Rumusan Standar Minimum Laporan Keuangan dan Business Plan untuk UMKM di Indonesia, Bank Indonesia. Barbane, F, 2011, A system dynamics-based Balanced Scorecard to support strategic decision making, International Journal of Productivity and Performance Management, Vol. 60 Iss 5 pp. 446 - 473 Chris Adams, dan Andy Neely, 2000, The performance prism to boost M&A success, Measuring Business Excellence, Vol. 4 Iss 3 pp. 19 – 23. El-Haik, B, dan Roy, D. M., 2006, Service Design For Six Sigma A Road Map For Excellence, Wiley-Interscience, New Jersey. Federico Cosenz, 2014, A Dynamic Viewpoint to Design Performance Management Systems in Academic Institutions: Theory and Practice, International Journal of Public Administration, 37:13, 955-969. Forrester, J. W, 1968, Industrial Dynamics-After the First Decade, Management Science, Vol. 14, No. 7, pp. 398-415 Garengo, P., Bianzzo, S., dan Bititci, U. S., 2005, Performance Measurement Systems In Smes: A Review For A Research Agenda, International Journal of Management Reviews, Volume 7 Issue 1 pp. 25–47. Kennerley, M., dan Neely, A., 2003, Measuring performance in a changing business environment, International Journal of Operations & Production Management, Vol. 23 No. 2, pp. 213-229. Lai, C.L., Ip, W.H., dan Lee, W.B., 2001, The system dynamics model for engineering services, Service Quality: An International Journal, Vol. 11 Iss 3 pp. 191 - 199 Manoochehr Najmi, Etebari, M, dan Emami, S., 2012, A framework to review Performance Prism, International Journal of Operations & Production Management, Vol. 32 Iss 10 pp. 1124 – 1146. Mel Hudson, Smart, M, dan Bourne, M., 2001, Theory and practice in SME performance measurement systems , International Journal of Operations & Production Management, Vol. 21 Iss 8 pp. 1096 – 1115. M. Hudson , J. Lean dan P. A. Smart, 2001, Improving control through effective performance in SMEs, Production Planning & Control: The Management of Operations, Vol 12:8, 804-813. Neely, A., Bourne, M., dan Kennerley, M., 2000, Performance measurement system design: developing and testingaprocess-basedapproach, International Journal of Operations & Production Management, Vol. 20 No. 10. pp. 1119-1145. Niven, P.R., 2006, Balanced Scorecard Step-by-step: Maximizing Performance and Maintaining Result, John Wiley and Sons, New Jersey. Paula Mettänen, 2005, Design and implementation of a performance measurement system for a research organization, Production Planning & Control: The Management of Operations, Vol 16:2, 178-188. Pusporini, P, Abhari, K, Luong, L., 2013, Development of Environmental Performance Model Using Design for Six Sigma (DFSS), International Journal of Materials, Mechanics and Manufacturing, Vol. 1, No. 1. Ricardo Chalmeta , Sergio Palomero dan Magali Matilla, 2012, Methodology to develop a performance measurement system in small and medium-sized enterprises, International Journal of Computer Integrated Manufacturing, Vol 25:8, 716-740. Sujatha Perera dan Pamela Baker, 2007, Performance Measurement Practices in Small and Medium Size Manufacturing Enterprises in Australia, Small Enterprise Research, Vol 15:2, 10-30. Umit S. BititciU, Trevor Turner, dan Carsten Begemann, 2000, Dynamics of performance measurement systems, International Journal of Operations & Production Management, Vol. 20 Iss 6 pp. 692 – 704. Yuliani Dan Pazli, 2010, Pengaruh Masuknya Sepatu Kulit Impor Asal Cina Di Indonesia Terhadap Industri Sepatu Kulit Cibaduyut Terkait Pemberlakuan Asean-China Free Trade Area (Acfta), - | in_ID |