Search
Now showing items 31-40 of 222
TINJAUAN KUAT GESER SENGKANG ALTERNATIF DAN SENGKANG KONVENSIONAL PADA BALOK BETON BERTULANG
(2006-01)
Reinforced-concrete requires bending and shearing reinforcement. Bending reinforcement is used to detain
bending moment, whereas shearing reinforcement (sengkang) is used to detain shearing load. Generally, vertical
shearing ...
KAJIAN PENGEMBANGAN PENGELOLAAN SUMBERDAYA AIR PADAWILAYAH SUNGAI PROGO-OPAK SERANG DENGAN RIBASIM
(2008-01)
Land use change in Progo-Opak-Serang (POS) River Basin has caused hydrologic behavior change, which it is
shown by the flooding events during the rainy season, and the lack of water allocation during the dry season. ...
PERILAKU RETAK BETON BERTULANG AKIBAT PEMBUATAN LUBANG DI BADAN
(2007-07)
Based on service capacity of reinforced concrete and the possibility of corrosion process that lead to
reinforcement deformation, cracking in reinforced concrete should be limited and only haired-cracking is allowed. ...
KONSENTRASI SEDIMEN SUSPENSI RATA-RATA KEDALAMAN BERDASARKAN PENGUKURAN 1, 2, DAN 3 TITIK PADA ALIRAN SERAGAM SALURAN TERBUKA
(2008-01)
The most appropriate and précise method for determining suspended sediment concentration or suspended
sediment discharge in channels is by sampling of suspended sediment data directly from the channel. Depth-integrated
and ...
ANALISIS KERUSAKAN STRUKTUR BANGUNAN GEDUNG BAPPEDA WONOGIRI
(2007-01)
The BAPPEDA office building of Wonogiri regency is an office owned by The Government of Wonogiri Regency
that has a function as a Development Planning Board and Research Office of the Regional Development in Wonogiri
regency. ...
EVALUASI KINERJA JARINGAN IRIGASI BANJARAN UNTUK MENINGKATKAN EFEKTIFITAS DAN EFISIENSI PENGELOLAAN AIR IRIGASI
(2007-01)
Area Irrigation of Banjaran is Area Irrigation Technical wide of number three in of Banyumas Regency. Intake
structure of Network Irrigation of Banjaran is on River of Banjaran. System Irrigation of Banjaran planned to ...
JEMBATAN PENYEBERANGAN DI DEPAN KAMPUS UMS SEBAGAI FASILITAS PEJALAN KAKI
(2007-01)
Crossing bridge located in front of UMS campus was designed for public crossing facility, especially for UMS
civitas academica. However, this facility does not work optimally. Therefore, this crossing bridge should be ...
PENGALIRAN PADA INTI BENDUNGAN TIPE URUGAN PADA PENGGENANGAN PERTAMA WADUK
(2006-06)
The first impoundment on the fill dams can be considered as a critical phase during the lifetime of the dam. The
change to the embankment materials, especially on clay core shall be carefully examined. Some dams were ...
PERILAKU DAN PENINGKATAN KAPASITAS BALOK TINGGI AKIBAT PERUBAHAN RASIO BENTANG GESER TERHADAP TINGGI EFEKTIF BALOK (a/d)
(2007-01)
The advantage of deep beam is it has a stiffness factor higher than conventional beam. Design of deep beamreinforced
concrete usually just consider minimum reinforcement only, for longitudinal reinforcement and ...
REROUTING TRAYEK ANGKUTAN UMUM (Studi Kasus Angkutan Umum di DKI Jakarta)
(2007-07)
Overlapping route and low level of service of public transport is an indicator of bad operation of public transport.
This condition can cause traffic jam particularly in city. The objectives of this research were detecting ...