dc.contributor.author | Ma'ruf, Rifzal Azka | |
dc.contributor.author | Sahid, Muh. Nur | |
dc.contributor.author | Solikin, Mochamad | |
dc.date.accessioned | 2014-10-31T07:13:16Z | |
dc.date.available | 2014-10-31T07:13:16Z | |
dc.date.issued | 2013-11-03 | |
dc.identifier.citation | Kamiana, I. 2012. Calculation techniques Debit Plan water work. Graha Ilmu, Yogyakarta. Peck, B. R. 1996. Engineering Foundation, Universitas Gajah Mada. Yogyakarta. Jaya Hilarion. 2009. Apartment Dewatering Project Planning In The Mansion. Universitas Tarumanegara, Jakarta. Tahara Haruo. 1983. Pumps & Compressors. PT. Pradnya Paramita. Jakarta. Asiyanto. 2006. Construction Dewatering method. UI-Press. Jakarta. Karyadi Denny. 2010. Basement Implementation and Application in Surabaya. Universitas Kristen Petra. Surabaya. Draft Technical Guidelines RPTO. 2010. Guidelines for Preparation of Technical Specifications Dewaterimg Jo. Jakarta. Priyono dan Ricky. 2007. Dewatering System Planning Development Implementation Plan Barricade In Motion Write Banjarnegara. Universitas Diponegoro. Semarang. Ashworth Allan. 1994. Planning The Cost Of Buildin. PT Gramedia Pustaka Utama. Jakarta Indonesian National Standard. 2008. SNI 2836-2008 Procedure for Calculation Work Unit Foundation For Building Construction And Housing. Department of PU. Jakarta. Hicks Tayler. 1996. Use of Pump Technology. Erlangga, Jakarta. | en_US |
dc.identifier.isbn | 9789796361544 | |
dc.identifier.uri | http://hdl.handle.net/11617/4917 | |
dc.description.abstract | The problems that were encountered in building construction with a basement is the presence of water in the
excavation area is located below the ground water table. One of the cases is the construction of Raft foundation Hotel
Anugerah Palace (HAP) Project in Surakarta. In which construction in order to dry from puddle, so made the
construction of foundation finished without disruption. To keep the area foundation worked well and dry, the
foundation construction used dewatering system. Dewatering system at Hotel Anugerah Palace (HAP) Project is a
predrainage method and open pumping method. To analysze dewatering system at Hotel Anugerah Palace (HAP)
Project a series of studies were conducted i.e : studies
the implementation of foundation method, dewatering method,
analysis of standing water volume with number of pump and analyze of toal cost dewatering. This is expected to be a
parameter in the analyze of the effect puddle water on the foundation and dewatering costs to complete the
implementation of the first stage of the project construction problems effectively and efficiently. The result shows in
the Hotel Anugerah Palace ((HAP) Project Surakarta, normal water volume 2,049 m3 / 2 minutes (cycle pump will run
every 5 minutes because the system live two minutes three minutes off). Requires six surface pumps, four submersible
pumps and two engine pumps (incidental). With details of operational cost analysis, equipment materials and labor to
the use of dewatering is completed during the 1.5 year total cost ± Rp 267,978,500, - | en_US |
dc.publisher | Universitas Muhammadiyah Surakarta | en_US |
dc.subject | Hotel Anugerah Palace ( HAP ) | en_US |
dc.subject | foundation work | en_US |
dc.subject | analyze cost | en_US |
dc.title | Cost Analyze Of Dewatering Work At Foundation Construction (Case Study Anugerah Palace Hotel ( HAP ) Project in Surakarta) | en_US |
dc.type | Article | en_US |