Pile Driving With Jack-In Pile At Building Project
View/ Open
Date
2013-11-03Author
Limanto, Sentosa
Kusuma, Jonathan H.
Agustine, W
Ricky, G.
Metadata
Show full item recordAbstract
Piling on building projects in urban or densely populated areas is done by a jack-in system by using a jack-in pile type
hydraulic static pile driver to be free of noise, vibration and pollution. In residential area, it should be used jack-in pile
to minimize disturbance to the environment because it does not cause vibration and noise compared other piling tool.
Globalization which is happening in the construction bussines requires its main actors are in an invironment of
increased competiton so it have to used a competitive piling tool. Construction of deep foundation have an very
complex structure, one type of tool that is often used stake is Jack-in Pile. That is piling system which implementation
is pressed into the ground using hydraulic jack. The analysis conducted with how long piling activity takes time at one
point piling. It is showed the ranking of each activity at one point piling and the mobilization activity need 3 hours and
48 minutes.