A comprehensive flow-ability study from coal
silo bunker, chain grade transfer and until crushed coal is
needed. For the coal silo bunker to ensure smooth flow of
coal in all seasons with different moisture contentsand
different percentage of fines. Maintaining a constant
supply of coal in the silo bunkers to coal feeder has proven
to be a challenge. Tanjung Jati B power plant has units 1
and 2, each unit has 6 coal silo bunker with a capacity of
500 tons, so a total of 12 coal silo bunker. In conclusion silo
bunker and coal feeder operation is not based on a precise
calculation but based on secure estimates fuel supply to
operate the boiler only.