Model of Risk Gas Pipeline Management to Determine Maintenance Strategy
dc.contributor.author | Usman, Yulita Veranda | |
dc.contributor.author | Sholihin, M. Yudi M. | |
dc.contributor.author | Ismail, Asrul Harun | |
dc.date.accessioned | 2014-12-03T07:46:00Z | |
dc.date.available | 2014-12-03T07:46:00Z | |
dc.date.issued | 2014-12-04 | |
dc.identifier.citation | [1] Standards Australia and New Zealand, Handbook Risk Management Guidelines companion to AS/NZS 4360:2004 (HB 436:2004), Sydney: Standards Australia International Ltd., 2005 [2] Standards Australia and New Zealand, Risk Management, AS/NZS 4360:2004, Sydney: Standards Australia International Ltd., 2004 [3] M. Yudi M. Sholihin, Analisa Umur Pakai, Sistem Pemipaan Produksi Minyak dan Gas Menggunakan Metode RBI, Risk Management Book Series 1, Jakarta: UI Press, 2003 [4] M. Yudi M. Sholihin, Analisis Laju Korosi Dalam Kaian Terhadap Tingkat Kekritisan Sistem Pemipaan Pada Area Proses Produksi Minyak dan Gas, Unpublished paper, Jakarta, 2008 [5] American Petroleum Institute, Specification for Line Pipe, API Spesification 5L, Forty-Second Edition, January, 2000 [6] American National Standard, ASME B318-2007, Gas Transmission and Distribution Piping Systems, ASME Code for Pressure Piping, B31, USA 2007 [7] _____, Risk Assessment for Unburied Korinci Pipeline (Bare Pipe) to Korinci Gas Plant in RAPP, Laporan Akhir, Kalila limited dan Pusat kajian & Terapan Keselamatan dan Kesehatan Kerja FKM UI, 2009 | en_US |
dc.identifier.issn | 2407-4330 | |
dc.identifier.uri | http://hdl.handle.net/11617/4984 | |
dc.description.abstract | Piping system failure often does not occurs in accordance with the technical life of the pipe. The failure is caused by the specific content of the gas passing through the pipeline. The risk management system is designed on the model of the gas pipeline risk management that can estimate the level of risk to next five years which is the function of the probability and consequence of failure. The probability of failure is obtained based on the corrosion rate of the wall thickness of the pipe while the impact is determined based on the significance value of 0.3. Maintenance strategy will be determined based on the results of inspections conducted on each of three years and failure of attributes component. | en_US |
dc.publisher | Universitas Muhammadiyah Surakarta | en_US |
dc.subject | gas pipeline | en_US |
dc.subject | risk management | en_US |
dc.subject | pipline inspection | en_US |
dc.title | Model of Risk Gas Pipeline Management to Determine Maintenance Strategy | en_US |
dc.type | Article | en_US |