Show simple item record

dc.contributor.authorTinasar, Azzuhfi Ilan
dc.contributor.authorSaputra, Roni Haryadi
dc.contributor.authorSahid, S.
dc.date.accessioned2017-07-20T04:05:14Z
dc.date.available2017-07-20T04:05:14Z
dc.date.issued2017-05-22
dc.identifier.citationBPS. 2016. DIY Dalam Angka. Yogyakarta: Badan Pusat Statistik. Hizbaron, D. R., Rahmat, P. N., Setyaningrum, A., & Melawani, M. N. (2015). Kajian Pola Spasial Kerentanan Sosial, Ekonomi dan Fisik di Wilayah Rawan Erupsi Gunung Merapi, Yogyakarta.. Jurnal Riset Kebencanaan Indonesia, 1 -11. Taufiq. 2016. Integrating Tsunami Disaster Risk Assessment into Coastal Spatial Planning dor Sustainable Development in Sukabumi District. Journal of Koji Asai, Division of Civil Environmental Engineering. Saputra dan Sardjito. 2016. Penentuan lokasi Bandara Udara di Kabupaten Lamongan. Jurnal Teknik ITS Vol. 5, No. 1, (2016) ISSN: 2337-3539 (2301-9271). Mardianto, Djati, et al. 2016. Kajian Multiancaman Bencana Berdasarkan Pendekatan Bentanglahan di Lokasi Pembangunan Bandara Baru, Kecamatan Temon, Kabupten Kulonprogo, Yogyakarta. Program Magister Geoinformation for Spatial Planning and Disaster Risk Mangement. Santius. 2015. Modeling Of Tsunami Disaster Risk In The Settlement of Bengkulu City Using Geographic Information System. Jurnal Permukiman Vol. 10 No. 2 November 2015 : 92-105. UNISDR. 2016. Tsunami Disaster Risk 2016, Past Impactsand Projections. Centre for Resarch on The Epidemiology of Disasters CRED. BPS. 2016. Kulon Progo Regency in Figures. Yogyakarta: PT. Pohon Cahaya. OXFAM. 2012. Disaster Crunch Model: Guidelines for Gendered Approach. Oxfam GB May 2012. Westen. Remote Sensing and GIS for Natural Hazards Assessment and Disaster Risk management. Faculty of Geo-Information Science and Earth Observation (ITC), University of Twente, hengelosestraaat 90. Kaunand S and Hidayat A. S. 2011. Potret Bandara di Indonesia. IRSDP BAPPENAS. Putra. P. Andhi. 2015. Mapping Tsunami Vulnerability for Mataram City in Lombok Island-Indonesia: A Phisical and Socioeconomic Assessmnet. Jurnal Pengembangan Kota volume 3 No. 1 (60-79). NATHAN J. WOOD & JAMES W. GOOD (2004) Vulnerability of Port and Harbor Communities to Earthquake and Tsunami Hazards: The Use of GIS in Community Hazard Planning, Coastal Management, 32:3, 243-269, DOI: 10.1080/08920750490448622 USGS 2017. Seismic Database. http://www.usgs.gov Widyawati, Ari et al. 2013. Kajian Kerentanan Bencana Tsunami di Pesisir Kabupaten Kulon Progo Propinsi D. I. Yogyakarta. Volume 2, Nomor 2, Tahun 2013, Halaman 103-110. Bhagaskoro, Pradipto, et al. 2016. Lokalitas dan Pembangunan Infastruktur Indonesia Tahun 2005-2015. Prosiding Seminar Nasional INDOCOMPAC. http://dephub.go.id/post/read/bahan-paparan-pt.-angkasa-pura-i-(persero).in_ID
dc.identifier.isbn978-602-361-072-3
dc.identifier.urihttp://hdl.handle.net/11617/9004
dc.description.abstractYogyakarta is a province that has an appeal to be visited by the domestic and foreign visitors. Two important factors that cause people to go to Yogyakarta are many tourism places and good educational institutions. Because of the increase in the number of passengers and the bustle of activity in Adisucipto airport (previous Airport), in 2012 the central and local government of Special Propince of Yogyakarta unveiled a new airport, which it is now still in progress and targeted to be completed in 2019. The election of new airport site is very close to the subduction zone of Eurasia and Indo-Australia plates where it frequently occures earthquakes and high probability of tsunami. In this study, to predict the risk level of the tsunami, we use the Crunc model, which the multiplication of the hazard to the vulnerability and subsequently modeled by Geographic Information System (GIS). Based on the simulation of tsunami wave height of 15 meters, There are 690.73 Ha (18.78%) of Temon Distrcit area which are medium risk while 210.239 Ha (5.71) of Temon District area with high risk. In addition, low risk in NYIA area is about 14.38 Ha (2.54%) and medium risk in NYIA area is near 440.84 Ha (77.88%). The area which has high risk in the NYIA area is about 110.81 Ha (19.57%).in_ID
dc.language.isoen_USin_ID
dc.publisherMuhammadiyah University Pressin_ID
dc.subjectEvaluationin_ID
dc.subjectTsunami Disaster Riskin_ID
dc.subjectGISin_ID
dc.titleEvaluation of New Yogyakarta International Airport (NYIA) in Temon District Based on Tsunami Disaster Risk using Geographic Information System (GIS)in_ID
dc.typeArticlein_ID


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record