dc.identifier.citationBasri, H. 2007. Panduan Start Up Boiler dan turbin PLTU 400 MW. Vol. 1 No.01, hal 2. Cilegon-Banten James, L. 2007. Enterprise Risk Management (Panduan Komprehensif Bagi Manajemen dan Professional Risiko). Vol. 1 No.01, hal 45. RAY Indonesia. Jakarta Juniani, A. I. 2010. Risk Identification and Implementations of Risk Management Method at Fuel Oil Systems. Mulyono. 2010. Penerapan Enterprise Risk Management Dalam Perusahaan. Sudirman. 2011. Enterprise Risk Management (ERM). MBT Konsultan. Jakarta Sukamto, R. A. 2010. Manajemen Risiko Enterprise. Jurnal Risk Management. Vol. 1 No.01, hal 1 – 7. Susilo, L. 2010. Manajemen Risiko Berbasis ISO 31000. Cetakan I. PPM. Jakarta Pusat Yusanto, S. 2011. Perbandingan antara Standar Australia / New Zealand AS/NZS 4360:2004 dan COSO Enterprise Risk Management. Jurnal Risk Management. Vol. 1 No.01, hal 2. Jakartaen_US
dc.identifier.issn2337-4349
dc.identifier.urihttp://hdl.handle.net/11617/3573
dc.description.abstractKrakatau Steam Power Plant (CPP) has a capacity of 400 MW that consists of 5 identical generating units. Based on operational reporting agencies data, failure of control operations occur in the process of start up boiler and turbine so that the research is focused on this issue which is one of the main causes of distracted generating units. Risk Management is required to manage and identify risks and calculate the value of the risk, with the aim to analyze and avoid risks that could threat CPP. Preliminary analysis in advance to the causes and effects of machine / component start up failure by applying Enterprise Risk Management (ERM) methods to decide the risk management policy. The results of the risk management methods of ERM in the five components of the boiler start-up causes disruption risk response determined that acceptance to the burner system components, forced draft fan, steam pipe valve and feed water boiler installation because it has a high level of hazard. While the four components of risk management causes disorder turbine start up all specified risk acceptance response to turbine oil system components, vibration, steam pipe, and pull control because it has a low hazard level.en_US
dc.publisherUniversitas Muhammadiyah Surakartaen_US
dc.subjectERMen_US
dc.subjectCPPen_US
dc.subjectStart up Boileren_US
dc.subjectTurbineen_US
dc.titleManajemen Resiko Kegagalan Pada Proses Start Up Boiler dan Turbin di Pltu Krakatau Daya Listrik dengan Enterprise Risk Managementen_US