Browsing Volume 10 No. 1, Maret 2014 by Title
Now showing items 6-10 of 10
-
A Predictive Model of Project Success Measurement for Government Building Construction Projects (Case Study in Cirebon)
(2014-08-16)Project success is the end of the main objectives of each project, including the government building construction projects. How well the success achievement of a government building construction project needs to be known ... -
The Ratio of Using Merapi Sand and Klawing Sand Towards Concrete’s Compressive Strength
(2014-08-16)Concrete is often used in civic engineering projects. Conrete that has the ability to restrain weight become the choice in determining the construction structure that will be used. The composition of concrete that consist ... -
Service Improvement Target of Purwoasri Terminal Kediri Using IPA Method and QFD
(2014-08-16)Passenger Terminal of road transport is one of transportation infrastructures that serve as a mode change node of public transport for passengers and goods by road. In this present, terminal condition in Indonesia decline ... -
Street Performance Analysis and Air Pollution Due to Traffic Flow in Front of Muwardi Hospital and PKU Muhammadiyah Hospital
(2014-08-16)Dr. Muwardi Hospital and PKU Muhammadiyah Hospital that included Solo is able to handle more than 4 of the diseases and the location of both the hospital located on the edge of the highway, so it will be affected by the ... -
A Study of Shear Strength Parameter’s Clay Stabilized With Lime on Wet Side Compaction
(2014-08-16)A structure built on expansive clay often are damage before reaching age plan. This is connected with soil shear strength paramater values, namely cohesion (c) and internal shear (φ). One of any methods to improve expansive ...