Show simple item record

dc.contributor.authorMardiaman
dc.contributor.authorTommy Utama, Natasasmita
dc.date.accessioned2014-05-13T04:00:03Z
dc.date.available2014-05-13T04:00:03Z
dc.date.issued2012-09
dc.identifier.citationAnonim. (1994) Peranan Konsultan Perencana dan Pengawas dalam menunjang keberhasilan sebagai Pelaksana Keppres No. 16 tahun 1994. Diskusi Panel Keppres No. 16/1994. DPD. Inkindo DKI Jakarta. Oktober Asiyanto (2006). Metode Konstruksi Bangunan Pelabuhan. Penerbit: Universitas Indonesia. Jakarta. David, R. (2008). Reformasi Sektor Pelabuhan Indonesia dan Undang-undang Pelayaran tahun 2008. USAID-SENADA. Indonesia Competitiveness Program. Jakarta. Dell‘Isola, J. Alphonso. (1982). Value Engineering in The Construction Industry . 3rd Edition. Van Nostrad Reinhold Company. Farid, F, and Mansour. (1994). ―Value Engineering and Total Cost Managing‖. AACE International Transaction. Morgatown, pp. 7-14. Marzuki dan Puti, F. (2007). Rekayasa Nilai: Konsep dan PeneRAPannya di dalam Industri Konstruksi. Fakultas Teknik Sipil dan Lingkungan. Institut Teknologi Bandung. Soeharto., I. (1995). Manajemen Proyek dari Konseptual sampai Operasional. Penerbir Erlangga. Jakarta. Hal.8. Triatmodjo dan Bambang. (2010). Perencanaan Pelabuhan. Beta Offset Yogyakarta. Zimmerman, and Larry W. (1986). Value Engineering. Willy Interscine.en_US
dc.identifier.issn1412-9612
dc.identifier.urihttp://hdl.handle.net/11617/4443
dc.description.abstractThis paper analyzes the application of Value Engineering in the process of Phase III Jetty construction in Tarjun, South Kalimantan. By the limited resources of local materials and labor, as well as the difficulty of the use of scaffolding above the sea level fluctuations of + 3 metre, it is necessary to look for alternative methods of construction ideas to get the savings potential work items and calculate the cost savings. One alternative method to avoid the use of formwork and scaffolding is a pre-cast method of implementation for some elements (partial composite precast system) where the floor slab and pre-cast beams jetty which was prepared separately in a workshop used as formwork, then casted on it as part of the structure composite (castinplace- concrete topping). This method can accelerate the implementation of construction, as well as efficient and optimal in the cost, but still with a good quality of implementation.en_US
dc.publisherLPPM UMSen_US
dc.subjectvalue engineeringen_US
dc.subjectjettyen_US
dc.subjectconstruction methoden_US
dc.subjectpre-casten_US
dc.titleValue Engineering On Executing Of Jetty Construction (Case Study On Jetty Construction At Phase III in Tarjun South Kalimantan)en_US
dc.title.alternativeValue Engineering Pada Pelaksanaan Konstruksi Jetty (Studi Kasus Pada Pembangunan Jetty Tahap III di Tarjun, Kalimantan Selatan)en_US
dc.typeArticleen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record