Show simple item record

dc.contributor.authorSumargo
dc.contributor.authorDjihad, Achmad
dc.contributor.authorSetiawan, Iwan
dc.contributor.authorArief Mulyadi, Dudi
dc.date.accessioned2012-03-05T05:26:48Z
dc.date.available2012-03-05T05:26:48Z
dc.date.issued2008-01
dc.identifier.issn1411-8904
dc.identifier.urihttp://hdl.handle.net/11617/137
dc.description.abstractTower is one of the facility to support signal which is influenced by the elevation factor. For a tower at high elevation, the influence of wind will be very significant to the structure. Therefore, wind site survey should be conducted prior to tower design. The type of tower considered is tapered monopole of 120 m high constructed at Meteorology and Geophysics Station, Semarang. The measurement of anemometer and data analysis resulting in wind velocity of 10-year return period. It was obtained that the maximum wind velocity was 100.8 km/hour or equivalent to 28 m/sec and this will the input for the following analysis. The upper structure analysis is carried out with the help of MsTower which is referred to EIA/TIA-F and LRFD concept. With input of maximum velocity obtained from survey, the tower was analyzed for internal forces. The axial forces is 115.0466 ton and moment about x-axis of 16.00 ton-m.en_US
dc.subjectantenna, monopoleen_US
dc.subjectreturn perioden_US
dc.subjectmaximum winden_US
dc.subjectMsToweren_US
dc.titleANALISA RESPON STRUKTUR MENARA PEMANCAR TIPE “MONOPOLE“ 120 m AKIBAT BEBAN ANGIN RENCANA DENGAN PERIODE ULANG 10 TAHUNAN DI STASIUN BADAN METEOROLOGI DAN GEOFISIKA SEMARANGen_US
dc.title.alternativeStructural Respond Analysis of Monopole Telecommunication Tower 120 m Subject to Design Wind Load with 10-Year Return Period at Meteorology and Geophysics Station, Semarangen_US
dc.typeArticleen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record