Browsing Volume 08 No. 1, Januari 2008 by Title
Now showing items 1-11 of 11
-
ANALISA RESPON STRUKTUR MENARA PEMANCAR TIPE “MONOPOLE“ 120 m AKIBAT BEBAN ANGIN RENCANA DENGAN PERIODE ULANG 10 TAHUNAN DI STASIUN BADAN METEOROLOGI DAN GEOFISIKA SEMARANG
(2008-01)Tower is one of the facility to support signal which is influenced by the elevation factor. For a tower at high elevation, the influence of wind will be very significant to the structure. Therefore, wind site survey should ... -
ANALYSIS OF REHABILITATION PRIORITY OF IRRIGATION INFRASTRUCTURE
(2008-01)The decreasing service function of the technical irrigation system should be supported by routine and periodical maintenance and rehabilitation which needs human resource and costs. Since limited resource is a problem to ... -
DRAINAGE TIME OF POROUS ASPHALT MIXES DUE TO THE VARIOUS PROPORTION AND CONCENTRATION OF SOILS
(2008-01)The function of porous pavement will be decreasing due to voids that are clogged by soil and dust. This condition is a common phenomenon until a certain period of time as this pavement has to be maintained by removing the ... -
KAJIAN PENGEMBANGAN PENGELOLAAN SUMBERDAYA AIR PADAWILAYAH SUNGAI PROGO-OPAK SERANG DENGAN RIBASIM
(2008-01)Land use change in Progo-Opak-Serang (POS) River Basin has caused hydrologic behavior change, which it is shown by the flooding events during the rainy season, and the lack of water allocation during the dry season. ... -
KALIBRASI MODEL IHACRES PADA DUA DAS IDENTIK
(2008-01)IHACRES has been applied on two sub-catchments (Kloposawit and Rawatmatu). These two sub-catchment are geographically located at the same climatic regions and having physical characteristic that relatively similair. A ... -
KONSENTRASI SEDIMEN SUSPENSI RATA-RATA KEDALAMAN BERDASARKAN PENGUKURAN 1, 2, DAN 3 TITIK PADA ALIRAN SERAGAM SALURAN TERBUKA
(2008-01)The most appropriate and précise method for determining suspended sediment concentration or suspended sediment discharge in channels is by sampling of suspended sediment data directly from the channel. Depth-integrated and ... -
PARAMETRIC STUDIES FOR OBTAINING THE DIMENSION OF SOIL IMPROVED AREA
(2008-01)In many cases, to improve weak soil (e.g. grouting method or other method), it must have the obvious understanding about the design of appropriate size of soil improved area, for example, road projects or deep ... -
PENGARUH JARI-JARI KELENGKUNGAN HORISONTAL BALOK TEPI BETON BERTULANG TERHADAP BEBAN DAN LENDUTAN
(2008-01)During this time civil engineers design horizontally curved reinforced beam in field using straight beams approach. The design codes of horizontally curved reinforced concrete beam didn’t exist in SK SNI T-15-1991-03 ... -
PENGARUH KINERJA TIM PROYEK TERHADAP KEBERHASILAN PROYEK
(2008-01)Project team is the one of the substance structures of construction industry to execute a project. Project team has had the unique characters. Project team’s structure organization is used in short time peroid of the ... -
PROSES DESAIN STRUKTUR PERKERASAN LENTUR YANG MEMPERHITUNGKAN VARIASI MODULUS PERKERASAN AKIBAT PENGARUH TEMPERATUR
(2008-01)The effects of pavement temperature on pavement modulus, particularly the asphalt layer modulus, are quite apparent. In the analytical design method, the effects of pavement temperature can be taken into account in term ... -
TEKNOLOGI PEMBUATAN BALOK SUSUN KAYU KOMPOSIT BERUKURAN BESAR DARI BALOK-BALOK KAYU BERUKURAN PENDEK DAN KECIL
(2008-01)The availability of large wood log as construction material is extremely decreasing right now. On the other hand, the availability of small and short wood log is abundant. The aim of this research is to create a technology ...